The object today was supposed to be finishing the tenons and short rails. In order to do that I needed an exact understanding of the relationship if the vises to the legs. The twin will has an control shaft that connects the two locking mechanisms. This will pass over one of the upper short […]
Workbench TWO – Day 20
The objective for today is mortises for the legs. The leg tenons have been cut but need the mortises. Since this needed exact registration, I decided to make a router template and cut the mortise using a Whiteside Ultimate Trim bit. This is a very robust and smooth cutting bit. So this will be a […]
Workbench TWO – Day 19
Workbench TWO – Day 15
Workbench TWO – Day 14
The objective today is legs. Squaring the ends, cutting to final length, locating and cutting all of the mortises. This includes lots of work with the plans to find dimensions and locate the correct location on the correct face of the milled leg. The day started with the plans. I got out the large version. […]